Services
SERVICE/10
EV Charging Bays & Carparks
Targeted fire safety engineering for EV charging and carpark facilities — addressing the hazards of lithium-ion storage and the NCC carpark provisions.
10/When you need this
- An EV charging station or bay is proposed within or adjacent to a carpark, basement or mixed-use building
- A local government or insurer requires a fire risk assessment for charging infrastructure
- Lithium-ion battery thermal runaway hazards need to be addressed in the fire strategy
- Carpark smoke management, ventilation or separation exceeds DtS provisions
- An existing carpark is being retrofitted with EV charging and compliance needs to be re-established


10/What we do
- 01Hazard assessment for EV charging bays, including lithium-ion thermal runaway and propagation risk
- 02Separation, compartmentation and barrier strategy between charging bays, adjacent occupancy and escape routes
- 03Detection, suppression and ventilation concept design for charging areas and carparks
- 04Smoke management modelling and analysis where DtS carpark provisions are exceeded
- 05Emergency response, access and signage provisions for EV and battery-related incidents
- 06Compliance pathway assessment against the NCC carpark provisions and referenced standards
10/What you receive
Fire Safety Strategy or Fire Engineering Report for the EV charging and carpark facility
Schedule of fire safety measures and design requirements for the design team
Risk-rated mitigation strategy addressing thermal runaway and propagation
Support in correspondence with the authority, insurer or asset owner
Codes & Standards
NCC carpark provisions, relevant Australian Standards, lithium-ion battery fire safety guidance
Typical turnaround — Turnaround confirmed on fee proposal
05/Enquiries
Get a fee proposal for EV Charging Bays & Carparks
Request a fee proposal
- +61 432 762 919
- John.Isaac@fireengineerconsultant.com.au
- East Perth, Western Australia