Services
SERVICE/09

Final Fire Safety Report & Construction Verification

Confirmation that what was engineered on paper was actually built on site.

09/When you need this
  • A performance solution has conditions requiring verification before occupancy
  • The certifier requires confirmation that fire safety measures have been installed as documented
  • Practical completion or occupancy permit documentation is being assembled
  • Commissioning of smoke management, detection or suppression systems requires witnessing
09/What we do
  • 01Construction-stage inspections at agreed hold points
  • 02Verification of fire safety measures against the Fire Engineering Report conditions
  • 03Witnessing of commissioning tests, including hot smoke testing where required
  • 04Review of contractor certificates, product certification and as-built documentation
  • 05Close-out of outstanding items with the builder and design team
09/What you receive

Final Fire Safety Report confirming implementation of the fire engineering strategy

Inspection records with photographs and a close-out register

Documentation suitable for submission with the occupancy permit application

Codes & Standards

NCC construction-stage verification requirements, referenced Fire Engineering Report conditions

Typical turnaround — Turnaround confirmed on fee proposal

05/Enquiries

Get a fee proposal for Final Fire Safety Report & Construction Verification