Services
SERVICE/09
Final Fire Safety Report & Construction Verification
Confirmation that what was engineered on paper was actually built on site.
09/When you need this
- A performance solution has conditions requiring verification before occupancy
- The certifier requires confirmation that fire safety measures have been installed as documented
- Practical completion or occupancy permit documentation is being assembled
- Commissioning of smoke management, detection or suppression systems requires witnessing


09/What we do
- 01Construction-stage inspections at agreed hold points
- 02Verification of fire safety measures against the Fire Engineering Report conditions
- 03Witnessing of commissioning tests, including hot smoke testing where required
- 04Review of contractor certificates, product certification and as-built documentation
- 05Close-out of outstanding items with the builder and design team
09/What you receive
Final Fire Safety Report confirming implementation of the fire engineering strategy
Inspection records with photographs and a close-out register
Documentation suitable for submission with the occupancy permit application
Codes & Standards
NCC construction-stage verification requirements, referenced Fire Engineering Report conditions
Typical turnaround — Turnaround confirmed on fee proposal
05/Enquiries
Get a fee proposal for Final Fire Safety Report & Construction Verification
Request a fee proposal
- +61 432 762 919
- John.Isaac@fireengineerconsultant.com.au
- East Perth, Western Australia