Services
SERVICE/12
Fire Authority Approvals & Submissions
We prepare and lodge the fire engineering submission and manage the referral process through to approval.
12/When you need this
- A project requires referral to the state fire authority as part of the approval pathway
- A fire authority has requested further information on a lodged submission
- Hydrant, booster, vehicle access or firefighting facility provisions need consultation with the brigade
- Referral conditions need to be closed out before the building permit or occupancy approval


12/What we do
- 01Submissions to DFES (WA), Fire and Rescue NSW, Queensland Fire Department, Fire Rescue Victoria and Tasmania Fire Service
- 02Consultation on hydrant, booster, vehicle access and firefighting facility provisions
- 03Response to fire authority requests for further information
- 04Coordination with the building surveyor, RBS and certifier on referral requirements
- 05Attendance at stakeholder and design review meetings
- 06Close-out of referral conditions through to approval
12/What you receive
Fire engineering submission package ready for lodgement with the relevant authority
Written responses to authority requests for further information
Meeting records and consultation outcomes documented for the project file
Confirmation of referral close-out and approval
Codes & Standards
NCC 2022 Volume One Section E, AS 2419.1, AS 2118.1, state fire authority referral guidelines
Typical turnaround — Turnaround confirmed on fee proposal
05/Enquiries
Get a fee proposal for Fire Authority Approvals & Submissions
Request a fee proposal
- +61 432 762 919
- John.Isaac@fireengineerconsultant.com.au
- East Perth, Western Australia