Services
SERVICE/12

Fire Authority Approvals & Submissions

We prepare and lodge the fire engineering submission and manage the referral process through to approval.

12/When you need this
  • A project requires referral to the state fire authority as part of the approval pathway
  • A fire authority has requested further information on a lodged submission
  • Hydrant, booster, vehicle access or firefighting facility provisions need consultation with the brigade
  • Referral conditions need to be closed out before the building permit or occupancy approval
12/What we do
  • 01Submissions to DFES (WA), Fire and Rescue NSW, Queensland Fire Department, Fire Rescue Victoria and Tasmania Fire Service
  • 02Consultation on hydrant, booster, vehicle access and firefighting facility provisions
  • 03Response to fire authority requests for further information
  • 04Coordination with the building surveyor, RBS and certifier on referral requirements
  • 05Attendance at stakeholder and design review meetings
  • 06Close-out of referral conditions through to approval
12/What you receive

Fire engineering submission package ready for lodgement with the relevant authority

Written responses to authority requests for further information

Meeting records and consultation outcomes documented for the project file

Confirmation of referral close-out and approval

Codes & Standards

NCC 2022 Volume One Section E, AS 2419.1, AS 2118.1, state fire authority referral guidelines

Typical turnaround — Turnaround confirmed on fee proposal

05/Enquiries

Get a fee proposal for Fire Authority Approvals & Submissions